Skip to content
SPORTING EVENTS

Coordinate every moment around the fixture.

EventBlok helps you take an event from first idea to live delivery. Create the sessions, organise speakers and spaces, run the show, and publish an agenda attendees can use — around the moments that cannot move.

MATCHDAY · 15:30 KO
timemomentwindowstate
14:00Gates opensoft
15:28Teams in tunnelhardlocked
15:30Kick-offhardlocked
16:15Half-time showhard14 min
17:20Trophy presentationhardlocked
cueactiondeptstate
CUE 21Pyro — tunnel archSFXSTBY
CUE 22Anthem playbackA/VGO
CUE 23Big screen — line-upsGFXSTBY
CUE 24Presenter to pitchsideFOH
ON CAMERA IN00:42
LINKTrophy presentation — sponsor read
NAMESCaptain · Head coach · Sponsor rep
DURATION90 seconds, hard out
NOTEHand back to gallery on applause
hard windows the show has to work aroundSHOWFLOW
15:30
kick-off, immovableDescribes how EventBlok works — not a measured statistic.
14
minutes of half-time showDescribes how EventBlok works — not a measured statistic.
1
running pictureDescribes how EventBlok works — not a measured statistic.
live
change → downstream surfaceDescribes how EventBlok works — not a measured statistic.
WHY IT MATTERS

Sporting events have hard start times and fixed windows. Ceremony, presentation and live entertainment all have to work around them — and still feel effortless from the stand.

BUILT AROUND FIXED MOMENTSOn the roadmap

Ceremonies, arrivals, presentations, half-time and post-event. Placed around the fixture.

Kick-off does not move. Mark the windows that are locked and the rest of the running order absorbs change around them instead of through them.

  • Hard windows marked and protected
  • Everything else re-times around them
  • Overruns shown against the window they threaten
A matchday running order with hard windows around kick-off.
MATCHDAY · 15:30 KO
timemomentwindowstate
14:00Gates opensoft
15:28Teams in tunnelhardlocked
15:30Kick-offhardlocked
16:15Half-time showhard14 min
17:20Trophy presentationhardlocked
cueactiondeptstate
CUE 21Pyro — tunnel archSFXSTBY
CUE 22Anthem playbackA/VGO
CUE 23Big screen — line-upsGFXSTBY
CUE 24Presenter to pitchsideFOH
ON CAMERA IN00:42
LINKTrophy presentation — sponsor read
NAMESCaptain · Head coach · Sponsor rep
DURATION90 seconds, hard out
NOTEHand back to gallery on applause
hard windows the show has to work aroundSHOWFLOW
EVERY CUE IN CONTEXTOn the roadmap

Show callers, operators and presenters get the detail behind each moment.

Pyro, anthem, big screen, presenter to pitchside. Each cue carries its department, its timing and the note that matters, rather than living in one person’s memory.

  • Cue-level run of show with departments
  • Standby and go states shared live
  • Notes attached to the cue, not the group chat
ShowflowIllustrative example
Main Stage — run of show01:12:44
09:30Opening keynoteAida OkaforLive
09:45Panel: honest interfaces3 speakersNext
10:15BreakFoyer
10:30Payments deep-diveSystems track
VIDEOVT-2AUDIOMic 4LXState 3
The running order the crew calls from — one cue live, the next one staged.
PUBLIC AND BACKSTAGE, CONNECTEDOn the roadmap

Publish the schedule attendees need without separating it from the plan.

Gates, entertainment, presentation times. The public schedule is generated from the same structure production is running, so the two cannot drift.

  • Published schedule for the stand and the concourse
  • Screens reading the same event record
  • Changes reaching both audiences at once
A published matchday schedule on an attendee phone.
fintechforum.comLIVE
My agenda
09:30Opening keynoteMain Stage
13:45Fireside — RegulatorsStudio
15:00Workshop — Fraud modelsHall 2
LODr. Lena OrtizHead of Risk, Northwind
MAM. AdeyemiPolicy lead, BankCo
RNR. NovakFraud architect
Main StageLevel 0 · North
StudioLevel 1 · East
Hall 2Level 0 · South
↻ fireside moved to 13:45 — updated
WHEN THE DAY MOVES

The fixture holds. Everything else adapts.

  1. Lock the fixtureOn the roadmap

    Kick-off, half-time and presentation are marked as windows the show works around.

    Hard windows locked around kick-off and the trophy presentation.
    MATCHDAY · 15:30 KO
    timemomentwindowstate
    14:00Gates opensoft
    15:28Teams in tunnelhardlocked
    15:30Kick-offhardlocked
    16:15Half-time showhard14 min
    17:20Trophy presentationhardlocked
    cueactiondeptstate
    CUE 21Pyro — tunnel archSFXSTBY
    CUE 22Anthem playbackA/VGO
    CUE 23Big screen — line-upsGFXSTBY
    CUE 24Presenter to pitchsideFOH
    ON CAMERA IN00:42
    LINKTrophy presentation — sponsor read
    NAMESCaptain · Head coach · Sponsor rep
    DURATION90 seconds, hard out
    NOTEHand back to gallery on applause
    hard windows the show has to work aroundSHOWFLOW
  2. Re-time the restOn the roadmap

    A delayed arrival compresses the build-up rather than pushing the moment that cannot move.

    AgendaIllustrative example
    Apex Summit 2026Day 1 of 3
    09:00Opening keynoteMainstage · Hall AConfirmed
    10:30A field guide to honest interfacesCraft · Studio 2Confirmed
    13:30Fireside with regulatorsSystems · Hall ADraft
    15:00Workshop: writing a run of showCraft · Studio 1
    The programme itself — every session with its track, room and speaker.
  3. Tell every deviceOn the roadmap

    Gallery, pitchside, presenter and big screen all read the change at the same time.

    ShowflowIllustrative example
    Main Stage — run of show01:12:44
    09:30Opening keynoteAida OkaforLive
    09:45Panel: honest interfaces3 speakersNext
    10:15BreakFoyer
    10:30Payments deep-diveSystems track
    VIDEOVT-2AUDIOMic 4LXState 3
    The running order the crew calls from — one cue live, the next one staged.
ALSO IN HERE

The matchday-specific parts.

  • Pitchside links

    On the roadmap

    Names, timings and the hard out, carried with the cue they belong to.

  • Trophy moments

    On the roadmap

    A cue-level plan for the two minutes everyone will remember.

  • SFX, A/V, GFX, FOH

    On the roadmap

    Each department reads its own filtered view of the same running order.

An arena-scale summit stage with a lit backdrop and thousands of seated attendees.
THE MOMENT

Fifty thousand people, and ninety seconds that have to be right.

The presentation, the pyro and the big screen are one moment. They read one running order.

◆ First event free — build it with the founderFIRST EVENT FREE

Build your event in EventBlok.

For the moments that have one chance to land.