Skip to content
PlatformFestivals
FESTIVALS

Many stages. One timeline. One public programme.

EventBlok helps you take an event from first idea to live delivery. Create the sessions, organise speakers and spaces, run the show, and publish an agenda attendees can use. Six stages running from midday to curfew, changeovers measured in minutes, and an audience deciding where to walk next. EventBlok holds every stage on one timeline and publishes the programme the field is actually reading.

Changeovers modelled. Curfews locked. Clashes visible before the gates open.

↻ 3 SESSIONS RE-TIMED
startsessionroomtrack
09:30Opening keynoteMain StageA
11:00Panel — Real-time paymentsMain StageA
13:45Fireside — RegulatorsStudioB
15:15Workshop — Fraud modelsHall 2B
16:45Closing remarksMain StageA
Track A — Main Stage
Day 1
09:30Opening keynote
11:00Panel — Real-time payments
16:30Closing remarks
Day 2
11:30Panel — Open banking
Track B — Studio / Hall 2
Day 1
13:30Fireside — Regulators
15:00Workshop — Fraud models
Day 2
10:00Workshop — Model governance
14:00Fireside — What comes next
downstream sessions re-timed · showflow followed · no clashesAGENDA
6stages on one timeline
0republish steps
1record, every stage
23:00curfew, held
WHY IT MATTERS

A festival timetable is a promise made to thousands of people at once. Change a stage time and the promise breaks in the field before it breaks anywhere else.

EVERY STAGE, ONE TIMELINE

Six stages side by side, with the changeovers in the plan.

The twenty minutes between acts is a reset, not free time. Model it and the schedule can tell you when a changeover is impossible rather than letting stage management find out.

  • Parallel stages on a single timeline
  • Changeovers and line checks as real slots
  • Curfews and licensed hours locked
A festival timetable with six stages running in parallel across a day.
↻ 3 SESSIONS RE-TIMED
startsessionroomtrack
09:30Opening keynoteMain StageA
11:00Panel — Real-time paymentsMain StageA
13:45Fireside — RegulatorsStudioB
15:15Workshop — Fraud modelsHall 2B
16:45Closing remarksMain StageA
Track A — Main Stage
Day 1
09:30Opening keynote
11:00Panel — Real-time payments
16:30Closing remarks
Day 2
11:30Panel — Open banking
Track B — Studio / Hall 2
Day 1
13:30Fireside — Regulators
15:00Workshop — Fraud models
Day 2
10:00Workshop — Model governance
14:00Fireside — What comes next
downstream sessions re-timed · showflow followed · no clashesAGENDA
WHAT THE FIELD SEES

A programme people can plan a day around.

Filter by stage or time, save the acts you want, get the new time when something moves. The published timetable is the one production is working from.

  • Searchable programme with personal line-ups
  • Saved acts update when a set time moves
  • Stage, site and access information attached
An attendee phone showing a festival programme with saved acts.
fintechforum.comLIVE
My agenda
09:30Opening keynoteMain Stage
13:45Fireside — RegulatorsStudio
15:00Workshop — Fraud modelsHall 2
LODr. Lena OrtizHead of Risk, Northwind
MAM. AdeyemiPolicy lead, BankCo
RNR. NovakFraud architect
Main StageLevel 0 · North
StudioLevel 1 · East
Hall 2Level 0 · South
↻ fireside moved to 13:45 — updated
STAGE BY STAGE

Each stage crew sees their own stage.

Same record, filtered to the stage they are running, with the site-wide picture available to whoever is holding it. When a set runs long, the knock-on is visible immediately.

  • A run of show per stage
  • Site-wide view for the production office
  • Overruns show their consequence to curfew
A stage-filtered run of show with changeover and line-check detail.
00:41:12
cueactiondeptstate
47.0House to halfLXdone
47.1VT roll — openerA/Vdone
48.0Keynote walk-onLX● GO
48.1Lower-third: nameGFXstby
PRESENTER VIEW · AUTOCUE
Good morning. Five years ago the rails we all depend on were invisible — today they’re the product.
OPERATOR · MIRRORED
voice syncLOCKED
drift+0.0s
streamdeckCONNECTED
deptlast call
FOHstanding by on 48.1
LXhouse at half, holding
A/VVT armed
GFXlower-third loaded
cue 47/213 · FOH · LX · A/V · GFXSHOWFLOW + PROMPTER
WHEN AN ACT IS LATE

A twenty-minute delay on one stage is a site-wide problem.

01

The clock is real

Durations rather than fixed times, so the day reflows and the distance to curfew is a number rather than a feeling.

A festival timeline recalculating after a late set.
↻ 3 SESSIONS RE-TIMED
startsessionroomtrack
09:30Opening keynoteMain StageA
11:00Panel — Real-time paymentsMain StageA
13:45Fireside — RegulatorsStudioB
15:15Workshop — Fraud modelsHall 2B
16:45Closing remarksMain StageA
Track A — Main Stage
Day 1
09:30Opening keynote
11:00Panel — Real-time payments
16:30Closing remarks
Day 2
11:30Panel — Open banking
Track B — Studio / Hall 2
Day 1
13:30Fireside — Regulators
15:00Workshop — Fraud models
Day 2
10:00Workshop — Model governance
14:00Fireside — What comes next
downstream sessions re-timed · showflow followed · no clashesAGENDA
02

The field is told

Saved line-ups update in place. Nobody walks twenty minutes across a site to an empty stage.

Attendee phones showing an updated set time.
fintechforum.comLIVE
My agenda
09:30Opening keynoteMain Stage
13:45Fireside — RegulatorsStudio
15:00Workshop — Fraud modelsHall 2
LODr. Lena OrtizHead of Risk, Northwind
MAM. AdeyemiPolicy lead, BankCo
RNR. NovakFraud architect
Main StageLevel 0 · North
StudioLevel 1 · East
Hall 2Level 0 · South
↻ fireside moved to 13:45 — updated
03

The crew already knew

Every stage sees the change where they are already looking, rather than on a radio call that half the site missed.

Stage crew views updating with a new set time.
00:41:12
cueactiondeptstate
47.0House to halfLXdone
47.1VT roll — openerA/Vdone
48.0Keynote walk-onLX● GO
48.1Lower-third: nameGFXstby
PRESENTER VIEW · AUTOCUE
Good morning. Five years ago the rails we all depend on were invisible — today they’re the product.
OPERATOR · MIRRORED
voice syncLOCKED
drift+0.0s
streamdeckCONNECTED
deptlast call
FOHstanding by on 48.1
LXhouse at half, holding
A/VVT armed
GFXlower-third loaded
cue 47/213 · FOH · LX · A/V · GFXSHOWFLOW + PROMPTER
ALSO IN HERE

The festival-specific parts.

SITE

Stages as places

Stage, field, tent and site area, each with capacity, access and the walk between them.

HOLDS

Unannounced acts

Pencil a slot without publishing it. The field sees it the moment you confirm, not before.

DAYS

Three-day builds

Multi-day programmes with their own crews, curfews and site changes per day.

A large outdoor festival audience silhouetted against a bank of stage lights.
THE ONLY THING THEY SEE

None of this is visible from the field. That is the point.

Every changeover, every line check and every recalculated set time exists so the twenty thousand people here only ever experience the show.

Plan your branded event →
◆ Launch benefit — white-label on the first fifty events

Put every stage on one timeline.

And publish the programme the field is really reading.