Skip to content
AGENCIES

Multiple clients. Multiple events. One workspace.

Nine briefs. Four producers. Clients who all expect their event to be the only one. Nine live briefs, four producers and a client who wants their own branding on the attendee portal. EventBlok holds every event as its own structure inside one workspace, so nothing bleeds between accounts and nothing is rebuilt per client.

AgendaIllustrative example
Apex Summit 2026Day 1 of 3
09:00Opening keynoteMainstage · Hall AConfirmed
10:30A field guide to honest interfacesCraft · Studio 2Confirmed
13:30Fireside with regulatorsSystems · Hall ADraft
15:00Workshop: writing a run of showCraft · Studio 1
The programme itself — every session with its track, room and speaker.
9
live events, one workspaceDescribes how EventBlok works — not a measured statistic.
1
branded portal per clientDescribes how EventBlok works — not a measured statistic.
0
templates rebuilt per briefDescribes how EventBlok works — not a measured statistic.
events per accountDescribes how EventBlok works — not a measured statistic.
WHY IT MATTERS

Agencies pay the rebuild tax nine times over. Every client gets the same spreadsheet, the same speaker pack and the same showflow, built again from nothing because the last one lived in a folder for a different account.

EVENTS THAT DO NOT BLEEDOn the roadmap

Every event is its own record. Shared nothing, except the way you work.

Client A cannot see Client B. Your producers can see both. The house style, the formats and the department conventions carry across without the content ever mixing.

  • Separate events per client, one workspace
  • Roles decide who sees which account
  • Your conventions travel between briefs
AgendaIllustrative example
Apex Summit 2026Day 1 of 3
09:00Opening keynoteMainstage · Hall AConfirmed
10:30A field guide to honest interfacesCraft · Studio 2Confirmed
13:30Fireside with regulatorsSystems · Hall ADraft
15:00Workshop: writing a run of showCraft · Studio 1
The programme itself — every session with its track, room and speaker.
THEIR BRAND, NOT OURSOn the roadmap

The portal looks like the client, not like software.

Colours, type and logo per event. The attendee sees the client’s event, and you are not explaining to a marketing director why their conference is wearing someone else’s branding.

  • Per-event branding on the audience portal
  • Embeds that sit on the client’s own domain
  • First five agencies: fully branded platform
An attendee portal carrying a client brand rather than the platform brand.
fintechforum.comLIVE
My agenda
09:30Opening keynoteMain Stage
13:45Fireside — RegulatorsStudio
15:00Workshop — Fraud modelsHall 2
LODr. Lena OrtizHead of Risk, Northwind
MAM. AdeyemiPolicy lead, BankCo
RNR. NovakFraud architect
Main StageLevel 0 · North
StudioLevel 1 · East
Hall 2Level 0 · South
↻ fireside moved to 13:45 — updated
THE SECOND ONE IS FASTEROn the roadmap

Last year’s event is this year’s starting point.

Duplicate a whole event and shift the dates. Or hand the new brief’s spreadsheet to Event Builder and get a Candidate Draft back to edit rather than a blank page to fill.

  • Duplicate an event and shift its dates
  • Import the client’s files into a draft
  • Formats and department conventions reused
ImportIllustrative example
programme.xlsx84 rows
BSession titlematchedMapped
CStart timematchedMapped
FSpeaker3 rows unclearReview
HRoommatchedMapped
Your spreadsheet, mapped to the programme — with the uncertain rows flagged, not guessed.
ACROSS THE ACCOUNTS

Nine events, and one producer holding four of them.

  1. One place to lookOn the roadmap

    Every live brief, its dates and where it has got to. Not nine folders and a shared drive nobody has opened since Tuesday.

    AgendaIllustrative example
    Apex Summit 2026Day 1 of 3
    09:00Opening keynoteMainstage · Hall AConfirmed
    10:30A field guide to honest interfacesCraft · Studio 2Confirmed
    13:30Fireside with regulatorsSystems · Hall ADraft
    15:00Workshop: writing a run of showCraft · Studio 1
    The programme itself — every session with its track, room and speaker.
  2. The same rigour per clientOn the roadmap

    Cue-level showflows, speaker prep and prompter on every account, because it is the same product rather than the effort of setting it up again.

    ShowflowIllustrative example
    Main Stage — run of show01:12:44
    09:30Opening keynoteAida OkaforLive
    09:45Panel: honest interfaces3 speakersNext
    10:15BreakFoyer
    10:30Payments deep-diveSystems track
    VIDEOVT-2AUDIOMic 4LXState 3
    The running order the crew calls from — one cue live, the next one staged.
  3. Handover is a linkOn the roadmap

    Clients and freelancers get a view rather than an attachment. Current when they open it, whoever they are.

    Speaker prepIllustrative example
    Speaker prep12 of 18 ready
    AOAida OkaforOpening keynote · slides inReady
    LOL. OrtizPayments panel · bio missingChasing
    MKM. KwanCraft workshop · slides inReady
    RBR. BaptisteFireside · headshot missingChasing
    What each speaker still owes you, without the chasing thread.
ALSO IN HERE

The agency parts.

  • Crew who come and go

    On the roadmap

    Give a freelancer the one event and the one department they are on, for the days they are on it.

  • Show the work

    On the roadmap

    A structured programme in a pitch is more convincing than a slide of a spreadsheet.

  • What actually ran

    On the roadmap

    Each event keeps what happened, not the plan. Useful evidence when the client asks next year.

Visitors moving between branded exhibition stands on a busy expo floor.
DIFFERENT CLIENT, SAME WEEK

Three of these are running at once, and two are yours.

Agencies do not have the luxury of one event at a time. The workspace has to hold all of them without letting any of them touch.

◆ First event free — build it with the founderFIRST EVENT FREE

Run every client from one workspace.

Separate events, shared conventions, and a portal that wears their brand.